The Comcast Tower required an enormous amount of plaza waterproofing to protect the interior space below. EDA was contracted to install the garden waterproofing as a compliment to the foundation waterproofing. The seamless transition between the foundation waterproofing and the horizontal waterproofing allowed for a leak free envelope.
project size:
40,000 sq. ft.
manufacturer:
CCW-500 Hot Melt Waterproofing
owner:
Liberty Property Trust
construction manager:
L.F. Driscoll Co.
date of completion:
6/2008 |
| mouseover thumbnails to see larger image |
 |
 |
|
EDA was selected to install under slab and blind-side waterproofing for this luxurious new condominium development. The installation of this waterproofing required extensive logistic challenges including the tight areas and depth of this foundation hole. The finished product will protect the fully automated state of the art parking system.
project size:
25,000 sq. ft. – Blind Side Waterproofing
manufacturer:
W.R. Grace Pre-Prufe
owner:
1706 Rittenhouse LLC
construction manager:
L.F. Driscoll Co.
date of completion:
11/2008 |
| mouseover thumbnails to see larger image |
 |
 |
|
EDA was trusted to be the waterproofing installer for the installation of the under slab waterproofing and the foundation waterproofing. With the ability to install all aspects of the waterproofing envelope, the two waterproofing systems were installed with no problems. In addition, EDA’s envelope was extended to include all air & vapor barriers and thru wall flashing.
project size:
18,000 sq. ft.
manufacturer:
W.R. Grace – Flonprufe 120 CCW
W.R. Grace - 860-861 Self Adhered Waterproofing
owner:
Villanova University
construction manager:
Gilbane Building Company
date of completion:
6/2008 |